The first floor concrete pour!

Starting at 8 a.m. on Wednesday, November 23, the first (ground) concrete floor of the Faculty Studio building was poured. By 1 p.m., the finishing touches were being applied.

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>